Intended outcomes
- A defined technical information register
- Visible local professional interfaces
- Separation of product evidence from building approval
Coordination workflow
Map requirements
Record site, use, loads, climate, fire, energy, accessibility and authority inputs.
Define roles
Identify the supplier, China coordination, local engineer, contractor, owner and authority interfaces.
Coordinate documents
Track calculations, drawings, product evidence and comments through controlled revisions.
Support local review
Respond to agreed technical queries while local professionals retain interpretation and sign-off.
Inputs required
- Site and building brief
- Local design criteria and authority route
- Appointed professional responsibility matrix
- Selected product and system information
Possible project deliverables
- Technical requirement register
- Responsibility and interface matrix
- Document and revision register
- Clarification log
- Supplier evidence schedule
Typical control checks
- Design criteria source and status
- System, connection and foundation interfaces
- Fire, envelope and service coordination
- Product-document applicability
- Local professional review and approval status
Who remains responsible
ExportPrefab
Coordinate agreed technical information and supplier responses.
Manufacturer / designer
Produce contracted system documents and evidence within its competence.
Locally licensed professionals
Interpret local requirements, adapt and verify the design, and provide required sign-off.
Authorities / owner
Authorities decide approvals; the owner makes appointments and provides the brief.