Intended outcomes
- Clear foundation and assembly interfaces
- Defined information and training scope
- A traceable issue and spare-parts route
Coordination workflow
Confirm interfaces
Review foundations, tolerances, access, lifting, utilities and weather protection inputs.
Prepare information
Coordinate the contracted installation sequence, drawings and inspection points.
Support readiness
Review local-team questions and training needs before materials arrive.
Manage issues
Record technical queries, defects, agreed dispositions and spare-parts actions.
Inputs required
- Approved installation information
- Foundation and survey records
- Local method statements and safety plan
- Delivery, crane, labour and storage plan
Possible project deliverables
- Installation document index
- Foundation and interface checklist
- Training or remote-support plan
- Technical query log
- Defect and spare-parts tracker
Typical control checks
- Document revision and construction status
- Foundation geometry and tolerances
- Lifting, bracing and temporary stability interfaces
- Weatherproofing and service connections
- Inspection, testing and handover responsibilities
Who remains responsible
ExportPrefab
Coordinate the agreed supplier information and remote support route.
Manufacturer
Provide contracted product information and respond to documented issues.
Local contractor
Control site safety, means and methods, temporary works, installation and workmanship.
Local professionals / owner
Verify local design and inspections and administer acceptance under the project contracts.