Project planning

How We Work

Each engagement begins with project facts. Scope, technical assumptions, exclusions and local responsibilities are made visible before detailed work.

What this means for a project

A structured route from project review through manufacturing and installation support. Final performance, dimensions, scope and program are confirmed only after project inputs and local requirements have been reviewed.

Preliminary assessment

Scope definition

Technical coordination

Delivery follow-through

Information needed for review

A useful first review needs the project location, intended building use, quantity, approximate floor area, number of storeys, target timing and any available drawings or tender documents.

Project inputs

Brief, drawings, site information, program and required supply scope.

Local review

Design criteria, professional appointments, approvals and site delivery conditions.

Responsibility boundary

The China supply team coordinates the agreed building-system scope and supporting documentation. Appointed local professionals remain responsible for local code interpretation, approvals and professional sign-off. Local contractors remain responsible for site execution and safety unless a written contract states otherwise.