| Saudi Arabia | Saudi-appointed project professionals | Product and shipment classification | Saudi project permit and acceptance path | Heat, dust, wind, corrosion | Inland route and crane | High | Code, import and responsibility evidence |
|---|
| Indonesia | Locally authorised design team | Component and import review | PBG and later SLF pathway | Seismic, rain, flood, corrosion | Port, island and last-mile route | High | Hazard, logistics and local-team evidence |
|---|
| Malaysia | PSP, engineers and registered contractor | Imported-material pathway | Project and local-authority pathway | Rain, humidity, condensation | Port, road and site storage | High | IBS, material and responsibility evidence |
|---|
| Philippines | Licensed architects, engineers and contractor | Shipment and component review | OBO, fire and occupancy pathway | Wind, seismic, flood, coastal | Island and last-mile route | High | Hazard, permit and factory QA evidence |
|---|
| Australia | Designers, certifier, builder and licensed trades | Product-specific evidence | State or territory project pathway | Class, wind, bushfire, flood, coastal | Oversize route, crane and temporary works | High | NCC evidence, acceptance and defect pathway |
|---|