Malaysia IBS Procurement and Imported-Material Checklist

Organise the Malaysia project route, current drawings, preliminary IBS inputs, manufacturer data, imported-material review, local appointments, logistics and landed scope before procurement.

Concept visualization of project planning resources. Documents shown are illustrative only.

Use the checklist before requesting a proposal

The core checklist is available on this page without an email gate. Unknown items can be marked for follow-up; they must not be converted into assumed project facts.

Project and procurement route

Project location, use, scale and current stage
Owner, consultant, contractor and procurement model
Tender requirements and decision programme

Drawings, IBS inputs and component schedule

Current architectural and engineering drawings
Preliminary IBS inputs without guaranteeing a score
System, material and component schedule
Interfaces with local work

Manufacturer and product information

Manufacturer and process information
Material certificates and product data
Quality plan, inspection points and mock-up needs
Document status and limitations

Imported-material review

Product classification and applicable route
Importer and submission responsibilities
Required evidence and project-specific status
Port, inland route and site storage

Local PSP, professionals and contractor

Appointed PSP and engineers
CIDB-registered contractor where required
Local approvals and statutory submissions
Installation, inspections and final acceptance

Local works, landed cost and review documents

Foundations, utilities and local trades
Freight, import, local delivery and installation
Scope, exclusions and commercial assumptions
Drawings, tender documents and available local inputs

Related project routes

Submit the information available for human review

The response will identify missing inputs and a practical next step; it is not an automatic compliance or engineering conclusion.