Use the checklist before requesting a proposal
The core checklist is available on this page without an email gate. Unknown items can be marked for follow-up; they must not be converted into assumed project facts.
Project identity and site
Country, site and operating environment
Owner, EPC or contractor
Intended use and project stage
Workforce capacity and building schedule
Total workforce and occupancy
Room and support-building schedule
Shift, rotation and separation requirements
Temporary, relocatable or permanent use
System and completion preference
Panelized, flat-pack, volumetric or open comparison
Required factory completion
Local labour, crane and installation assumptions
Utilities and infrastructure
Power, water, sewage and hot water
HVAC, fire and communications
Kitchen, laundry, road, drainage and lighting loads
Site access, transport and crane
Destination port or border
Inland route and limits
Site gate, turning and storage
Unloading, crane and sequence
Local appointments, quality and handover
Local professionals and contractor
Inspection and concealed-work points
Packing and cargo records
Installation, O&M and spares
Commercial scope and programme
Supply boundary and exclusions
Incoterm if known
Target occupancy and phases
Documents available to attach